Accelerated water main renewals
Sedgebrook water supply upgrade
Parkes Avenue water supply upgrade
Lincoln Road water supply upgrade
Ngatarua Road water supply upgrade
- Replacement of 710 meters of 125mm spiral riveted water main with PVC. The spiral riveted pipe is failing and requires significant ongoing repairs and replacing these assets will reduce risk of ongoing failure in addition to reducing leakage.This includes 107 meters on Sedgebrook Street in Whanganui East, 270 metres on Parkes Avenue on St John's Hill and 330 metres on Lincoln Road in Springvale.
- Replacement of 164 metres of small diameter galvanised pipe with a new 125mm PE pipe on Ngatarua Road to provide an adequate level of service, meet firefighting requirements and actual and anticipated growth.
These accelerated water mains replace existing failing assets. This will reduce the risk of ongoing failures and leakage within the network. In addition they improve the level of service and the ability for the network to meet firefighting requirements.
These works have been completed.
Mosston Road water supply upgrade – stage 2
Construction of 1325 metres of new 225mm PE pipe along Mosston Road. This new water main will provide a critical link between zones increasing resilience within the water supply. This will also improve Whanganui District Council’s ability to meet actual and anticipated growth.
These works have been completed.
Airport water upgrade
800m of new 250mm PE pipe connecting the 250mm water main in Taupo Quay across the Cobham Bridge to the 150mm water main along Wikitoria Road.
This will ensure adequate supply and improved resilience in the Airport Water Zone and specifically critical assets including the Whanganui wastewater treatment plant and the airport. The connection across Cobham Bridge will also increase resilience to the southern extent of the Whanganui East zone.
These works have been completed.
Fordell water supply scheme
Fordell is a rural area and the Fordell water supply scheme is a restricted supply, with water supplied to a 350 people and an area of approximately 3,900 hectares.
The scheme is close to the Whanganui urban supply and connecting this supply to the Whanganui supply – a distance of about 3.7km – would improve the level of service and resilience for Fordell.
These works have been completed.
Peakes Road to Aiken Road water main
This project has extended the remaining useful life of a ring-main water supply line to the Peakes Road area, providing an additional degree of redundancy and resilience against outages as a result of earthquakes or other environmental disruptions.
A new pipe has been inserted inside the existing infrastructure to minimise excavation, reinstatement and disruption.
These works have been completed.