Somme Parade drop-out repair
Whanganui River bank opposite 131 Somme Parade, Aramoho 4500
Significant erosion to about 136 metres of the Whanganui River bank opposite 131 Somme Parade (Axiam Plastics) has made the riverbank footpath unsafe to use and threatens the integrity of the road and gas pipeline under the footpath
Temporary Closure : 27 June 2024
Whanganui Alliance crews will be at the site of the Somme Parade drop-out repairs for three weeks from Tuesday, 2 July to replace a broken stormwater main.
The work requires a deep excavation, which means this section of Somme Parade will close to all through-traffic from 2 July until 5pm on Friday, 19 July 2024.